Reading corner: Inbox
The project is captured, but you have not decided what a finished reading corner should include. Keep it in Inbox while you clarify the result and whether you want to take it on.
- Describe what would make the corner ready to use.
- Identify a concrete next action, such as measuring the available space.
Reading corner: Next Actions
Use this status when the project is active and you can move it forward. The project describes the result; its child tasks describe the actions. Choosing this status for the project leaves each child task’s status unchanged.
- A useful next action could be measuring the space beside the window.
- Choose a status for that task separately.
Reading corner: Scheduled
This fits when you have deliberately chosen to return to the project later. For example, you might plan to work on it after moving house. A date can make that decision more specific, but the status itself does not set one.
- Add a date or reminder in Mement if you want one.
- Review the tasks separately; they do not inherit this status.
Reading corner: Waiting For
This fits if the whole project is currently blocked by an external result, such as permission to alter the room. Record what you need if that helps your review. An individual task can still have a different status if it is possible to do it now.
- Waiting detail example: permission from the property owner.
- Keep the measurement task as a Next Action only if you can actually do it.
Reading corner: Someday
Keep the project here if you want to preserve the idea without committing to it now. You can reconsider it during a later review. Existing child tasks keep their own statuses until you change them.
- Example reason: the current room arrangement works for now.
- Check the project again when your space or priorities change.
Measurement task: Inbox
The task still needs clarification. Perhaps you have not chosen which window, what dimensions are needed or where to keep the measurements. Clarify those details before treating it as ready to do.
- Name the location and the measurements you need.
- Move it to Next Actions once the action is clear and possible.
Measurement task: Next Actions
You know where to measure, have the tools and can do the task. This is a concrete next action for the reading-corner project. It can be ready to do even when the project has a different status.
- Example action: measure the available width and height.
- Add a date only if the action needs one.
Measurement task: Scheduled
You have chosen to measure later. For example, Monday at 10:00 may suit your schedule. Select Scheduled for that decision and set the date separately if you want it recorded.
- The status alone does not create a Monday reminder.
- The reading-corner project keeps its own status.
Measurement task: Waiting For
The task depends on something outside your control, such as gaining access to the room. Use Waiting For while that dependency prevents you from taking the measurement.
- Waiting detail example: the room becomes accessible after the repair.
- When access is available, review whether the task is ready to do.
Measurement task: Someday
The measurement belongs to a possible future layout that you have not chosen to pursue. Keep the task for later consideration instead of presenting it among actions you intend to do now.
- Review it when you decide whether to change the room.
- This choice does not change the project or the drawing task.
Drawing task: Inbox
Clarify what drawing is needed, who should provide it and whether you have requested it. Capturing a task called “receive the drawing” does not itself mean that someone is already preparing it.
- If you still need to make the request, name that concrete action.
- If the request is already sent, Waiting For may describe the situation.
Drawing task: Next Actions
Next Actions fits an action you can take yourself. If you need to request or follow up on the drawing, edit the task in Mement to describe that action. Receiving a drawing that someone else is preparing remains an external dependency.
- Possible action title: ask the carpenter for the drawing.
- Changing a GTD status does not rename the task automatically.
Drawing task: Scheduled
This fits when you have deliberately chosen to handle the drawing later, for example by following up on Monday. Add the chosen time separately. If the drawing is simply due from someone else, Waiting For may be the clearer status.
- Use the task title to describe the action you intend to take.
- A date and a reminder remain optional settings.
Drawing task: Waiting For
You have requested the drawing and the carpenter’s reply is the next external result you need. This status makes that dependency clear while the measurement task can remain ready to do.
- Waiting detail example: the carpenter’s shelf drawing.
- If useful, add a separate reminder to follow up.
Drawing task: Someday
The drawing belongs to a project you may revisit, and you are not currently pursuing it. Check whether anyone is already expecting a reply from you before leaving it for a future review.
- Keep enough context to understand the idea later.
- Reassess it when you decide to continue the reading-corner project.